Future Moscow · Phase 2 · New Construction

Future Middle School

A new purpose-built middle school on district-owned Oylear Field — designed around how middle school students actually learn, collaborate, and connect. Built in Phase 2 once the Phase 1 levy retires.

The Short Version
Phase 2 — Fully Planned. The new middle school is funded through a replacement Plant Facility Levy that begins the moment Phase 1 retires — at a lower annual rate than Phase 1. If the replacement levy passes, the new middle school would be complete within approximately 9 years of the Phase 1 levy passage and 2 years of the Phase 2 levy passage.

The new middle school on district-owned Oylear Field is designed from the ground up for the way middle school students actually learn today — highly collaborative, relationship-driven, and student-centered. The design is ready. The site is reserved. The funding path is clear.

113,627 sqftTotal Building Area
~9 YearsFrom Levy Vote to Completion
Oylear FieldD St & Mountain View Rd
The final cost of the new middle school will be determined through the design and bidding process beginning after Phase 2 levy approval. Construction costs ten years from now depend on many factors that cannot be reliably predicted today. What is clear is that building it would require a separate voter-approved Plant Facility Levy in a future election.
Exterior Renderings
Interior Renderings

Renderings by Lombard Conrad Architects — Pre-Bond Conceptual Package, July 2025. Preliminary and subject to change.

Site Plan
Floor Plans
Design Vision
“A safe, adaptable, and supportive school environment that is rooted in Moscow values and empowers every student to belong, connect, and explore.”

The design process began with extensive listening across the district — eight group meetings, staff surveys, a facility tour, and student engagement. Five design themes emerged:

Rooted in Community

Strong indoor/outdoor connections, community-accessible gathering spaces, and design reflecting Moscow's culture and outdoor identity.

Flexible & Future-Ready

Adaptable classrooms, flexible breakout spaces, shared interdisciplinary learning zones, and infrastructure capacity for future technology and programming changes.

Student Belonging & Wellbeing

Counseling and decompression spaces with acoustic separation, natural light throughout primary learning spaces, and comfortable student gathering areas.

Creativity & Exploration

Expanded makerspaces, podcast/media production environments, robust CTE and applied learning space, and performing arts support.

Operational Clarity & Security

Reduced and controlled access points, zoned after-hours community circulation, passive supervision through visibility, and durable maintainable materials.

How Phase 2 Is Funded

Building the new middle school would require its own voter-approved measure. The likely mechanism:

Timeline
Planning Documents
All materials are preliminary and for planning and budgeting purposes only. Floor plans, renderings, cost estimates, and site layouts reflect the design as of July 2025 and will likely change as the project moves through design development and the board approval process.
Explore the Full Plan

See how the Middle School fits into Future Moscow

The following information is required by Section 34-914, Idaho Code:

The estimated average annual cost to the taxpayer on the proposed levy is a tax of $280 per $100,000 of taxable assessed value, per year, based on current conditions.

The proposed levy would be assessed for 7 years.