Phase 2 — Future Project. This project is not funded by the Plant Facility Levy on the November 3, 2026 ballot. It would require separate voter approval in a future election.
Architectural rendering of the Future Elementary School, front entrance view
Future Moscow · New Facility

New Elementary School

A new elementary school on the south side of Moscow, built to relieve overcrowding and serve the district's fastest-growing area.

Estimated Cost: $26 Million

Architectural rendering by Lombard Conrad Architects — design in progress, subject to change.

The Short Version

Moscow's south side is growing, and West Park Elementary — the school that has served south Moscow for decades — cannot expand to meet that growth. The Future Elementary School on Palouse River Drive is its replacement: a purpose-built school for the families already there and the families on the way. When the new elementary opens, West Park Elementary reverts to the City of Moscow per the existing agreement between the district and the city. The city is actively exploring options for the West Park site, including a potential sale to the University of Idaho as part of the university’s long-term campus planning. The site includes expanded preschool space and sits adjacent to city-developed fields and green space.

$26MEstimated Cost
2 StoriesBuilding Design
Not FundedRequires Future Vote
Funding for this project has not been identified. South Elementary is part of the district’s long-range facilities plan but is not funded by the November 2026 Plant Facility Levy. Building it would require a separate future voter-approved measure. The design work shown here is preliminary and is presented so the community can see the full long-range plan.
What Makes This Site Special
Expanded Preschool Options The new building is designed to support expanded preschool programming — bringing early learning opportunities closer to the families on Moscow's south side who need them most. Earlier access to quality early childhood education strengthens outcomes for students before they ever enter kindergarten.
City of Moscow Fields & Green Space The City of Moscow is developing athletic fields and green space adjacent to the school site on Palouse River Drive. Students gain access to outdoor recreation and play space beyond what the school grounds alone could provide, and the surrounding community gains additional park and recreation space.
Nearby Arboretum The school site sits in close proximity to an established arboretum — a natural outdoor classroom for science, nature study, and environmental education that enriches the school's curriculum with real-world learning just steps away.
SEL Manufacturing Campus Neighbor Schweitzer Engineering Laboratories' manufacturing facility on US-95 is a neighbor to this site. Many SEL employee-owners live on Moscow's south side and send their children to MSD281 schools. A new elementary school in this corridor would serve families in the surrounding area, including SEL employees who live on Moscow’s south side.
Serving Where Moscow Is Growing New housing development on Moscow's south side has outpaced the capacity of existing facilities. The Future Elementary School is located precisely where enrollment growth is happening — reducing commute distances for south-side families and balancing enrollment pressure across the district.
Exterior Views

These architectural sketches show the current design direction for the Future Elementary School. All images are preliminary and subject to change.

Architectural sketches and renderings by Lombard Conrad Architects — preliminary, for planning purposes only.

These images are preliminary and for planning and budgeting purposes only. Renderings, floor plans, and site layouts will likely change and adapt over time to best meet the needs of students, staff, and the community. Do not rely on these materials for final program, space, or construction specifications.
Site Plan

The new school sits alongside athletic fields and green space being developed by the City of Moscow — a true neighborhood destination that serves both students and the broader south-side community.

Site plan showing school building, parking, and adjacent sports fields
Site Plan — School & Adjacent Fields
Aerial Context
Inside the Building

Early floor plans show a layout organized around grade-level clusters, with shared spaces — gym, cafeteria, library — anchoring the building's first floor.

Floor 1 plan
Floor 1
Floor 2 plan
Floor 2
These plans are preliminary and for planning and budgeting purposes only. Floor plans, renderings, and site layouts reflect the design as of this drafting and will likely change and adapt over time to best meet the needs of students, staff, and the community. All figures are estimates. Do not rely on these drawings for final program, space, or construction specifications.
Planning Documents

The following documents are available for public review. All materials are preliminary and for planning and budgeting purposes only.

These documents are preliminary and subject to change. They are shared for public information purposes as part of the Future Moscow planning process.

Explore the Full Plan

See how this fits into Future Moscow

Future Moscow is a facilities planning initiative of Moscow School District #281. Renderings and floor plans by Lombard Conrad Architects; design in progress and subject to change. Questions? Contact Shawn Tiegs, Superintendent, at stiegs@msd281.org or 208-892-1139.

The following information is required by Section 34-914, Idaho Code:

The estimated average annual cost to the taxpayer on the proposed levy is a tax of $280 per $100,000 of taxable assessed value, per year, based on current conditions.

The proposed levy would be assessed for 7 years.