Architectural presentations, design documents, and election materials for the Future Moscow initiative.
Materials for the projects funded by the measure on the November 3, 2026 ballot.
Architectural presentation covering the proposed conversion: floor plans, site plans, additions, and program areas.
XLSDetailed room-by-room program comparison of existing and proposed spaces, with square footage by area.
Design materials for projects in the district’s long-range plan. These projects are not funded by the November 2026 measure and would each require separate voter approval in a future election.
Conceptual design for a new middle school at Oylear Field: renderings, floor plans, site plan, and program areas.
PDFConceptual exterior renderings and floor plan prepared as part of the Moscow Sports Field & School Site Study.
PDFAerial site context drawing showing the proposed school in relation to surrounding fields and streets.
The ballot question as adopted by the Board of Trustees on August 26, 2026, with voter registration and polling information.
WEBOfficial election notices, deadlines, sample ballots, absentee information, and early voting locations.
For detailed financial information, visit the Budget & Funding page.
The following information is required by Section 34-914, Idaho Code:
The estimated average annual cost to the taxpayer on the proposed levy is a tax of $280 per $100,000 of taxable assessed value, per year, based on current conditions.
The proposed levy would be assessed for 7 years.